The Saloon

The changes in the existing saloon consisting of replacing the laminated flooring, which was partially destroyed when taking it up to cut the hatch and install the toilet tank; filling in the existing study door in readiness for the changeover to the bathroom; removing a somewhat odd stand-off unit housing one of the radiators and remounting that radiator onto the cabin side; installing a decorative banister unit and general redecoration (as at Nov 2007 this is yet to be completed).



The existing saloon looking forward The existing saloon looking aft
   
   
The old study door filled in and a bookcase installed The sanitation pipes, valves and pump from the new underfloor tank
   
   
The sanitation pipework boxed in The odd stand-off radiator housing removed
   
   
The cabin side repanelled ready for the radiator to be refitted The radiator refitted - the pipework to be tidied up at a later date
   
   
Building the decorative banister unit The completed decorative banister unit
   
   
Laying the sub-floor ready for the new laminated flooring Partially laid new flooring
   
   
The finished Karndean laminated flooring - looking forward The finished Karndean laminated flooring - looking aft
   