There was no bathroom on Janna, just an en-suite shower
and hand basin in the Master's bedroom. There was also a hand basin in the
toilet cubicle.
There was a study at the rear end of the saloon, which
was initially earmarked as Krystyna's studio. However, after further thought we
decided to convert this study into the bathroom, and build Krystyna's studio in
the fore cabin.
The conversion of this study entailed fully tiling the
walls and floor, moving the doorway and closing off the existing entry,
installing a grey-water tank and pump system and the bath, hand basin and
toilet, new lighting, as well as a whole load of plumbing.....
| The existing study | The existing study |
![]() |
![]() |
| The grey water waste tank and Whale Gulper pump | The floor tiling in progress |
![]() |
![]() |
| The wall tiling and lighting installation in progress | A completed tiled wall |
![]() |
![]() |
| The slipper bath installed and plumbed in | The toilet installed and plumbed in |
![]() |
![]() |
| The hand basin installed and plumbed in with various accessories | Towels rail, etc. |
![]() |
![]() |
| The repositioned doorway with folding louvre doors | The doorway from outside in the stairway lobby |
![]() |
![]() |